MAATEL, product and electronic engineering

Lastest news

2005-05-25 - ISO 9001 : 2000

maatel_images/news/20050802151325-news-Diapositive1.png

MAATEL has succesfully pass the 2005's audit concerning the ISO 9001 : 2000 certification.

MAATEL has been certified ISO 9002 in 1995, then ISO 9001 (1993) in 1998 and finally ISO 9001 : 2000 in 2003.

Taking this opportunity MAATEL has decided to reorganize its Quality Insurance Manual to write a clearer document describing the main processes used in the company.

2005-04-02 - A new Production centre for MAATEL

Continuously increasing the quality of our products and services is one of the main concerns of the MAATEL's Management.
Improving the working condition being one of the target for this year it has been decided to bring all MAATEL's employees in a same location.
The PURCHASING and PRODUCTION sevices will move in a new building adapted to the productions supplied by our company.
With an area over 1100 m² this new building is particularly adapted

  • to clarify the production flows.
  • to protect the products against the electrostatic discharges.
  • to insure the confidentiality of the products.



2005-01-20 - MAATEL invest in a mechanical design software

In response to the needs of the Scientific Instrumentation activity MAATEL has invested in the mechanical design software SOLIDWORKS.

In the same time our company is are pleased to announce the arrival of a new engineer graduated in mechanical design from the Ecole Centrale des Arts et Manufactures in PARIS and obtained a Master degree from GeorgiaTech (USA).

2004-10-15 - Production in compliance with the RoHS Directive

Since many years the MAATEL's Management is involved in the protection of the environment. That is why a very active approach has been decided to give an adapted risponse to the constraints resulting from the RoHS directive.
The next steps will be the following :

  • At the end of 2004 : 100% of the "lead free" components will be identified
  • October 2005 : 100 % of the reflow soldering process will be in compliance with the directive
  • Mars 2006 : 100 % of the wave soldering process will be in compliance with the directive


Pages : << 1 - 2 - 3 - 4>>
pixel transparent

Site valide XHTML 1.0 Strict et CSS 2